Skip to content
Advertisement

FILE - In this Sept. 29, 2016, file photo, shows a section of the Dakota Access pipeline under construction near St. Anthony in Morton County, N.D. North Dakota regulators are investigating whether the developer of the pipeline removed too many trees while laying pipe in the state. A report from a third-party inspector identified more than 80 sites where trees might have been improperly cleared. Energy Transfer Partners denies violating terms of its permit. And its plan for replacing trees calls for crews to plant more than two trees for every one that was removed. (Tom Stromme/The Bismarck Tribune via AP, File)/The Bismarck Tribune via AP)

FILE - In this Sept. 29, 2016, file photo, shows a section of the Dakota Access pipeline under construction near St. Anthony in Morton County, N.D. North Dakota regulators are investigating whether the developer of the pipeline removed too many trees while laying pipe in the state. A report from a third-party inspector identified more than 80 sites where trees might have been improperly cleared. Energy Transfer Partners denies violating terms of its permit. And its plan for replacing trees calls for crews to plant more than two trees for every one that was removed. (Tom Stromme/The Bismarck Tribune via AP, File)/The Bismarck Tribune via AP)

Featured Photo Galleries

01-Army parade.png

Military parade celebrates Army’s 250th

Cheers and chants rang out Saturday from a crowd of thousands as soldiers manned modern and historic tanks and aircraft for the Army’s 250th anniversary celebration in the District.

20250330 Sabatini-Caps-Sabres 001.jpg

Ovi scores goal 890, Caps lose to Sabres 8-5

Alexander Ovechkin scored goal number 890, but the Washington Capitals fell short, losing to the visiting Buffalo Sabres Sunday afternoon 8-5 at Capital One Arena in Washington D.C., March 30, 2025 (Photos for the Washington Times.)