
FILE- In this Dec. 21, 2018 photo, construction crews work on the new Harbor Bridge project on Interstate-37 in Corpus Christi, Texas. Construction on a $930 million project to replace a Corpus Christi bridge is behind schedule despite reaching a major milestone this month. The Corpus Christi Caller-Times reports that construction company Flatiron/Dragados recently acknowledged that the replacement of the 60-year-old Harbor Bridge likely won’t be complete by its April 2020 deadline. The first span of the bridge was put into place on the north side of the Corpus Christi Ship Channel this month. (Rachel Denny Clow/Corpus Christi Caller-Times via AP, File)
Featured Photo Galleries
Military parade celebrates Army’s 250th
Cheers and chants rang out Saturday from a crowd of thousands as soldiers manned modern and historic tanks and aircraft for the Army’s 250th anniversary celebration in the District.
Ovi scores goal 890, Caps lose to Sabres 8-5
Alexander Ovechkin scored goal number 890, but the Washington Capitals fell short, losing to the visiting Buffalo Sabres Sunday afternoon 8-5 at Capital One Arena in Washington D.C., March 30, 2025 (Photos for the Washington Times.)
Hegseth joins veterans, generals to mark 80th anniversary of battle of Iwo Jima
A handful of retired Marines – all in the late 90s or over 100 — joined Defense Secretary Pete Hegseth and Japan’s Prime Minister Takeru Ishida on Saturday to mark the anniversary of one of the bloodiest battles of World War II in the Pacific that ended 80 years ago this week.