
In an Aug. 21, 2017 photo, a pipe fitter lays the finish finishing touches to the replacement of Line 3 stretch before it is covered up. Enbridge already has started building the 14-mile stretch of Line 3 from the Minnesota line to its terminal in Superior, Wis. In filings with the Public Utilities Commission Monday, Sept. 11, The Minnesota Department of Commerce says Enbridge Energy has failed to establish the need for its proposal to replace its aging Line 3 crude oil pipeline across northern Minnesota. Instead, the department says it might be better to just shut down the existing line. (Richard Tsong-Taatarii/Star Tribune via AP)
Featured Photo Galleries
Military parade celebrates Army’s 250th
Cheers and chants rang out Saturday from a crowd of thousands as soldiers manned modern and historic tanks and aircraft for the Army’s 250th anniversary celebration in the District.
Ovi scores goal 890, Caps lose to Sabres 8-5
Alexander Ovechkin scored goal number 890, but the Washington Capitals fell short, losing to the visiting Buffalo Sabres Sunday afternoon 8-5 at Capital One Arena in Washington D.C., March 30, 2025 (Photos for the Washington Times.)
Hegseth joins veterans, generals to mark 80th anniversary of battle of Iwo Jima
A handful of retired Marines – all in the late 90s or over 100 — joined Defense Secretary Pete Hegseth and Japan’s Prime Minister Takeru Ishida on Saturday to mark the anniversary of one of the bloodiest battles of World War II in the Pacific that ended 80 years ago this week.