
A special crane stacks pipes weighing several tons each which will be used for the construction of the Nord Stream gas pipeline in the Sassnitz-Mukran harbour in northeastern Germany, 06 December 2016. The first sections of the 1,200 kilometer pipeline were delivered in late October 2016. Around 2,000 of a total 90,000 steal pipe components are currently being stored on the island of Ruegen. According to the Gazprom subsidiary Nord Stream 2 AG, work will begin in mid-2017. So far the politically controversial pipeline, which will have a total capacity of some 55 billion cubic meters, has not recieved building permission. Photo by: Jens Büttner/picture-alliance/dpa/AP Images
Featured Photo Galleries

Military parade celebrates Army’s 250th
Cheers and chants rang out Saturday from a crowd of thousands as soldiers manned modern and historic tanks and aircraft for the Army’s 250th anniversary celebration in the District.



Ovi scores goal 890, Caps lose to Sabres 8-5
Alexander Ovechkin scored goal number 890, but the Washington Capitals fell short, losing to the visiting Buffalo Sabres Sunday afternoon 8-5 at Capital One Arena in Washington D.C., March 30, 2025 (Photos for the Washington Times.)

Hegseth joins veterans, generals to mark 80th anniversary of battle of Iwo Jima
A handful of retired Marines – all in the late 90s or over 100 — joined Defense Secretary Pete Hegseth and Japan’s Prime Minister Takeru Ishida on Saturday to mark the anniversary of one of the bloodiest battles of World War II in the Pacific that ended 80 years ago this week.






