Skip to content
Advertisement

A Spider Barge (right) distributes outer-channel sediment into a barge held in place by a tug boat (left), as a Cutter Head Dredge Alaska (outside frame) pumps material through the pipe. The work is part of the Savannah Harbor Expansion Project. The outer channel will extend up to 20 miles into the Atlantic when complete, making the entire shipping channel 40 miles long from entry to Garden City Terminal. Image courtesy of U.S. Army Corps of Engineers.

A Spider Barge (right) distributes outer-channel sediment into a barge held in place by a tug boat (left), as a Cutter Head Dredge Alaska (outside frame) pumps material through the pipe. The work is part of the Savannah Harbor Expansion Project. The outer channel will extend up to 20 miles into the Atlantic when complete, making the entire shipping channel 40 miles long from entry to Garden City Terminal. Image courtesy of U.S. Army Corps of Engineers.

Featured Photo Galleries

01-Army parade.png

Military parade celebrates Army’s 250th

Cheers and chants rang out Saturday from a crowd of thousands as soldiers manned modern and historic tanks and aircraft for the Army’s 250th anniversary celebration in the District.

20250330 Sabatini-Caps-Sabres 001.jpg

Ovi scores goal 890, Caps lose to Sabres 8-5

Alexander Ovechkin scored goal number 890, but the Washington Capitals fell short, losing to the visiting Buffalo Sabres Sunday afternoon 8-5 at Capital One Arena in Washington D.C., March 30, 2025 (Photos for the Washington Times.)